Our customers :

ENPPI , ARAMCO , BAPETCO , Petrojet , ETHYDCO , BP , GUPCO, PETROBEL, ORASCOM , SHELL , QARUN , SUCO , ASORC , THE EGYPTIAN OPERATING COMPANY ELNG , SUMED , Burullus Gas company  ,Hassan Allam Construction (HAC), The Egyptian Black Sand Co , Egyptian Refining Company (ERC)……..atc

Some from our Reference :-

  • Tube Bundle E1518-A1,A2, B1, B2 (4 ea) for HCU Naphta Stabilizer Overhead Condenser.
  • Tube Bundle for HCU Naphta Stabilizer (2ea) , Shell for Condenser X-2101-E3 A/B (2ea).
  • Supply Dymot 22kW Boom Stacker Luffing Winches to Hassan Allam Construction (HAC)& The Egyptian Black Sand Company (EBSC) for the extraction of economic minerals from black sand.  ,    The black sand project is a unique value added model for Egyptian economy in the sourcing of economic minerals locally, especially ilmenite, rutile, wet zircon, dry zircon, monazite, magnetite, and granite, which are extracted from heavy, black sand that precipitates on shorelines.
  • Supplied 560 valves to SUCO in DISOUCO  project TM valves , Gate, Check.
  • Supplied  “EXPANSION JOINTS” 20″ & “Piping Valves” for NAPHTHA COMPLEX PROJECT (ISBL) for ASSIUT OIL REFINING COMPANY (ASORC)
  • Last PO supplied in 09/2018 pipes 36″ for PETROJET ,Project Name: PETROSALAM Platform (NWO)745m
  • ZOHR DEVELOPMENT PROJECT :Supply welded and seamless pipes 8″ up to 48″ above 11000 Meter
  • ZOHR DEVELOPMENT PROJECT : Supply Urgent Gasket 30″/2500# Material INCONEL 625
  • ZOHR DEVELOPMENT PROJECT : Supply Stud bolts above 2600 bolts
  • ORASCOME Construction Supply Burullus Power Plant HDPE Pipes above 30000 meter and HDPE Fittings
  • ORASCOME Construction :West Damietta simple cycle project power plant Supply Safety valves
  • project  Yanbu’ Aramco Sinopec Refining Company (YASREF) Limited supply valves .
  • PetroJet /BP West Nile Delta Onshore Gas Development Project , SAW Pipe 28″,30″,36″
  • Petrojet , El Shat Project , Fuel Reservoirs Construction (Gate, Check quantity 1370 valve ) ,Notify GoE EAA EGYPTIAN ARMAMENT AUTHORITY
  •  Agreement mutually agreed with Qarun Petroleum  for two years  supply valves (Ball ,Gate, Globe,  Check, Strainer,Manually Adjustable Chock Valve ) class 150,300,600,800,900,1500#
  • ORASCOME Construction Supply Burullus Combined Cycle Power Plant 4800mg  Valves (Ball ,Gate, Globe,  Check )
  • ENPPI / E-Styrenices co. Egyptian Polystyrene production ,project 200,000 MTA Polystyrene plant
  • ENPPI & BAPTCO PROJECT  ASSIL & KARAM GAS,  more valves  Duplex
  • ENPPI ,  BURULLUS PLANT THROUGHPUT INCREASE PROJECT , supply valves ( 1/2″ to 12″)
  • ENPPI , West Harbor Expansion Project For Piping Valves
  • ENPPI , ANRPC, New CCR Unit Project , supply stud bolts urgent
  • ENPPI, ANRPC Project  supply Rubber Expansion Joints
  • GUPPCO Urgent Valves  for project BP
  • Qarun Petroleum  (Ball valve 2,3,4″ class 600# Duplex ,Globe 2″/800#)
  • Mansoura Petroleum valves 351 CF8 Ball valve WOG 600#
  • ETHYDCO’s Utilities & Offsites Project for PIPING
  • EMC , Elliptical head 2 : 1 of I.D=3656mm (HOT FORMING)
  • ARAMCO :SAUDI KAYAN PROJECT
  • Petrozenima , MUZHIL Development Project , Supply Offshore POWER CABLES above 9000 meter
  • TAQA Arabia , supply Ball valves 6/600#
  • Egyptian Operating Company (ELNG) , supply several valves
  • Trips Khalda / Petrojet (6) (67) Ball valve
  • Wasco  supply Flanges ( 3 1/8 , 3 1/16) 5000PSI , 10000PSI)